FIT Rates for 2018/2019

Date of publication: 09/04/2018
1 April 2018 – 31 March 2019
1 April 2018 Version
2018/19
Tariff Description PV Tariff Level* 1Apr to 30 Jun 2018 1 Jul to 30 Sep 2018 1 Oct to 31 Dec 2018 1Jan to 31 Mar 2019
Solar photovoltaic (other than stand-alone) with total installed capacity of 10 kW or less Higher 4.01 3.93 3.86 3.79
Middle 3.61 3.54 3.47 3.41
Lower 0.31 0.25 0.20 0.15
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 10 kW but not exceeding 50kW Higher 4.25 4.17 4.11 4.03
Middle 3.83 3.75 3.70 3.63
Lower 0.31 0.25 0.20 0.15
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 50 kW but not exceeding 250kW Higher 1.85 1.79 1.75 1.69
Middle 1.67 1.61 1.58 1.52
Lower 0.31 0.25 0.20 0.15
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 250 kW but not exceeding 1 MW 1.50 1.43 1.38 1.33
Solar photovoltaic (other than stand-alone) with total installed capacity greater than 1 MW 0.31 0.25 0.20 0.15
Stand-alone solar photovoltaic 0.15 0.13 0.10 0.07
*PV Tariff Level is detailled as follows:
Higher tariff rate will be applied if an EPC of level D or above is achieved before commissioning
Middle tariff rate will be applied if an EPC of level D or above has been achieved but the Generator owns 25 or more installations
Lower tariff rate will be applied if an EPC of level D or above is not achieved before commissioning
Note: FIT Payment rates for solar photovoltaic installations have been determined by the Gas and Electricity Markets Authority (Ofgem) under Article 13 of the Feed-in Tariffs Order 2012, in accordance with Annex 3 to Schedule A to Standard Licence Condition 33.
Page 1
2018/19
Description   1Apr to 30 Jun 2018 1 Jul to 30 Sep 2018 1 Oct to 31 Dec 2018 1Jan to 31 Mar 2019
Hydro generating station with total installed capacity of  100kW or less 8.07 8.06 8.04 8.03
Hydro generating station with total installed capacity greater than 100kW but not exceeding 500kW 6.49 6.48 6.46 6.46
Hydro generating station with total installed capacity greater than 500kW but not exceeding 2 MW 6.49 6.48 6.46 6.46
Hydro generating station with total installed capacity greater than 2 MW 4.73 4.73 4.73 4.73
Wind with total installed capacity of 50kW or less 8.46 8.39 8.31 8.24
Wind with total installed capacity greater than 50kW but not exceeding 100 kW 5.01 4.94 4.91 4.87
Wind with total installed capacity greater than 100kW but not exceeding 1.5 MW 2.15 2.13 2.12 2.12
Wind with total installed capacity exceeding 1.5MW 0.66 0.65 0.64 0.64
Anaerobic digestion with total installed capacity of 250kW or less 4.60 4.56 4.53 4.50
Anaerobic digestion with total installed capacity greater than 250kW but not exceeding 500kW 4.36 4.34 4.30 4.27
Anaerobic digestion with total installed capacity greater than 500kW 1.61 1.57 1.55 1.54
Combined Heat and Power with total installed capacity less than 2kW 14.52 14.52 14.52 14.52
Export Tariff 5.24 5.24 5.24 5.24
All tariff rates are specified as pence per kilowatt hour at 2018/19 values.
Page 2

Tarrif copied from Ofgem website www.ofgem.gov.uk